Project duration:  2016

The huge amount of distributed generation now connected to the network has created the need for a strong dialogue between Distribution Network Operators and the owners and operators of distributed generation. In particular outages and constraints on the network can have significant impacts on generators’ income.

Regen is working with Western Power Distribution to run a regular forum with distributed generation DG asset owner/operators with the aim of working collaboratively to improve procedures and information on outages and constraints on the network. The forum is leading to much improved communication and visibility of outages.

Led by: Merlin Hyman

Contact: samaa@regensw.co.uk